Quick Links
Construction Projects
Each year the Township of Tiny resurfaces a selection of roadways using a priority-based 10 year plan and available financial resources. This plan - the "Roads Needs Study" is updated every five years and is based on current road conditions.
Construction Zone Safety
When driving through construction projects, consider your safety and the safety of our workers. Keep your speed within posted limits. Allow room around workers and flag signalers. Obey all directions and signs at the site. Fines for speeding in construction zones are doubled when workers are present.
Construction Projects for 2011
The 2011 construction season projects are:
Surface Treatment - Spring 2011
- Old Penetanguishene Road - 2.5 km. (from Forget Road to Highway 93)
- Dawson Road - 1.3 km
- Concession 6 West - 3.1 km
- MacAvalley Road - 3.0 km
- Marchand Road - 570 m
- Moreau Parkway - 1400 m
- Duquette Court - 335 m
- Lannan Drive - 435 m
- Celestine Court - 135 m
- Gary Court - 125 m
- Bourgeois Court - 135 m
- Gignac Court - 145 m
- Rue de Lac - 390 m
- Delbrooke Court - 140 m
- Cranbrooke Court - 255 m
- Huronia Court 185 m
- Nottawasaga Court - 220 m
- Cape Cod Court - 140 m
- Rue de Parc - 230 m
- Nassau Court - 155 m
Asphalt
- Baseline Road - 400 m (North of Concession 9 East to Balm Beach Road) - June
- Concession 18 West - 2.0 km. (Cedar Point Road to Sandy Bay Road) - June
- Chemin du Loup - 0.9 km. (Base of hill to Centre Beach Road) - September
- MacAvalley curve improvement - 0.7 km (through curve) - June

